Professional window and door processing service provider
Get In Touch
Professional window and door processing service provider
Search
en
Broken bridge lift gate
Broken bridge lift gate
Broken bridge lift gate

Broken bridge lift gate

MOQ: 1 Pieces
Delivery time: 15 Day
Super load-bearing capacity, stable and durable, top-notch safety protection, capable of withstanding high-intensity impact, typhoon-resistant structure, thermal break insulation structure, excellent energy-saving and sound insulation, intelligent and convenient operation, and full-scenario customized solutions
Product Details

Key Features:
✅ Break-Over Bridge Hinge System

Reinforced steel hinges distribute weight evenly, reducing stress on panels.

Ensures smooth, quiet operation even under frequent use.

✅ High-Strength Construction

Material Options: Galvanized steel, aluminum, or insulated PVC panels.

Thickness: 40mm–80mm insulated panels for thermal efficiency (U-value: 0.5–0.7 W/m²K).

✅ Excellent Insulation & Weatherproofing

Polyurethane foam core minimizes heat loss and noise.

EPDM seals prevent dust, wind, and water infiltration.

✅ Safety & Reliability

Auto-reverse mechanism with photoelectric sensors for obstacle detection.

Emergency manual release for power outages.

✅ Customizable Design

Sizes: Standard widths 2m–12m, heights 2m–8m (custom sizes available).

Colors: RAL powder-coated finishes (30+ options).

Windows & Ventilation: Optional glazed panels or louvers.

✅ Smart Control Options

Compatible with remote control, Wi-Fi, and smart home systems.

Integration with industrial automation (optional).

Technical Specifications:
Wind Load Resistance: Up to 12级 (EN 12424).

Operating Temperature: -30°C to +70°C.

Cycles: 50,000+ (tested to EN 12635).

Opening Speed: 0.15–0.25 m/sec (adjustable).

Applications:
✔ Warehouses & Logistics Centers
✔ Manufacturing Plants
✔ Aircraft Hangars
✔ Retail & Automotive Facilities
✔ Cold Storage Units

Why Choose Our Break-Over Bridge Door?
CE, ISO 9001, SGS certified.
OEM/OEM support with fast lead times (15–30 days).

Previous: Broken bridge lift gate

Next: No More